00Wholesale · Edge · Micro Edge

Power, density,
and proximity.
Built wholesale.

Bombe designs, builds, and operates wholesale edge and micro edge data centers for AI training, inference, and high-density compute workloads.

250+ MW
Pipeline
12
Sites in development
<12 mo
Time to energization
24/7
NOC
01What Bombe builds

Three formats. One operating discipline.

01

Wholesale Edge

Multi-MW build-to-suit facilities in tier 2/3 markets, optimized for AI training and HPC density.

02

Micro Edge

Modular sub-MW deployments for inference, CDN, and latency-sensitive workloads.

03

Powered Shell to Turnkey

Site sourcing, power procurement, design, construction, and operations under one roof.

02Capabilities

Built for high-density compute.

Engineered from the substation to the rack. Specified to meet the thermal and electrical envelope of next-generation accelerators.

  • 01100 to 250+ kW per rack
  • 02Direct-to-chip and immersion liquid cooling ready
  • 03N+1 redundancy, concurrently maintainable
  • 04Behind-the-meter and grid-tied power options
  • 05Dark fiber and carrier-neutral interconnect
  • 0624/7 remote hands and on-site operations
03Who we serve

Infrastructure for the compute economy.

Bombe delivers capacity to operators who can't wait three years for a hyperscaler build.

Segment 01

AI Infrastructure Operators

Capacity for training clusters and inference fleets.

Segment 02

Bitcoin and HPC Miners

Power-dense sites engineered for sustained heavy load.

Segment 03

Cloud and Inference Platforms

Edge proximity for low-latency, high-throughput workloads.

04Partners

Partnered with operators shaping the next compute cycle.

05Why Bombe

Wholesale economics. Operator instincts.

01 / Speed to power

We secure megawatts where others wait years.

02 / Operator DNA

Built by people who run sites, not just finance them.

03 / Capital aligned

Wholesale economics, long-term contracts, predictable returns.

04 / Edge by design

Proximity, density, and latency engineered into every site.

06Process

From greenfield to live load.

  1. Step 01

    Site Sourcing

    Identify markets with power, fiber, and load demand.

  2. Step 02

    Power Procurement

    Lock in megawatts through utility and behind-the-meter paths.

  3. Step 03

    Design and Build

    Engineered for high-density, liquid-cooled compute.

  4. Step 04

    Energization

    Sub 12-month delivery from groundbreak to live load.

  5. Step 05

    Operations

    24/7 NOC, remote hands, and on-site engineering.

07Contact

Have load?
We have power.

Request a capacity conversation with the Bombe team.